ü钻镗床SPM
Customer’s Initial Machining Process:
- Used a conventional lathe.
- Manual 3 jaw chuck.
- Feeding HSS pilot drill manually
- Feeding HSS finish drill manually. .
- Heat treating the material and then boring using a VMC
- Total machining time of 20-30 分钟.
Our machine concept & Implementation:
Features and Specs:
- 重罗纹, fabricated and stress relieved structure.
- 头顶上的基地, a stationary fixture is provided. The fixture consists of V blocks and hydraulic clamps to clamp the component.
- On one side the fixture, drilling head is mounted on hydraulic cross slides. Sliding surfaces is made of LM guideways and blocks. The slide has a stroke of 300 毫米.
- The drilling head is driven by a 20HP motor connected to the spindle through timer belt and pulley mechanism.
- The drilling head’s motor are routed through VFD for stepless speed variation from 300-1500 转.
- The slide is driven through a servo motor which is coupled to a ballscrew through a 1:4 ratio servo reducer to provide feed rates of 10mm/min to 7500mm/min.
- The machine is provided with spindle through coolant and chip flushing.
- The machine will be provided with complete machine enclosure.
- The machine will be provided with PLC programmed auto-cycle. A touch screen HMI will be provided for machine parameter setting and trouble shooting.
操作顺序:
- Load the component on the fixture and press auto-cycle.
- The component gets clamped.
- Through coolant is switch on. The drilling head spindle starts, drills the component with 3 pecking cycles and retracts. Spindle stops
- The finish drilling head moves, drills the component to the finish bore and retracts. Spindle and coolant stops
- The component clamp disengages.
Cycle Time:
The cycle time of the machine from component clamp to unclamp condition consider the bore diameter Ø44x220mm is 180 seconds
最后的结论:
Lathe:
- Component setup time is high.
- Machining time is high
- Need of skilled operators.
- Due to manual feeding, operation is prone to operator’s fatigue, which may lead to loss in efficiency of production.
- Even though tooling cost is less, considering the machining time, operator’s salary, the overall cost is more.
U-Drilling and Boring SPM:
- No need of skilled operator. Cost of skilled operators is reduced.
- Uses U-drills with indexable inserts. Cost of tooling is reduced.
- The total drilling time is 3 分钟, instead of 15-20 minutes on a lathe. Efficiency is more than 6 times. Increases the productivity, increases profitability, increases the scrap generation rate.
- Machine provided with adjustable V blocks and clamps, which can accommodate a variety of components.
Video:
联系我们获取产品信息
联系方式
- +91-80-28361767
- info@shenoyengineering.com
- +91-80-28361725
产品
- 工具 & 刀具
- 铣削专业化
- 专用机
- 金属切削SPM
- 专用机
- 8 Station Rotary table based Drilling and Chamfering SPM
- 四头铣削 SPM
- 两工位四轴车削 SPM
- CNC 3 轴4个的主轴仿形铣削SPM
- 锥度铣削 SPM
- 三轴攻丝 SPM
- ü钻镗床SPM
- Drilling, 倒角和去毛刺 SPM
- Con Rod Taper Milling SPM
- Con Rod Small End Bore Chamfering SPM
- 旋转门内铣削SPM
- 3 Axes, CNC, ID Trepanning, OD Turning & End Threading SPM
- Table Top Drilling Machine with Servo Positioning
- Double Head Slot Milling & Notch Milling SPM
- Double Head Slot Milling & Drilling SPM
- 双面铣床 - 经济版
- 2 轴数控辑阵车圆锥的SPM
- Twin Station 8 Axes CNC Controlled Rough Turning SPM
- Quadruple Head Slot Milling & Slitting SPM
- 复式切入面对SPM
- H BEAM, I BEAM MILLING, DRILLING & TAPPING MACHINE
- Rotary Coordinate Drilling SPM
- 深孔钻床
- CNC BORING MILL- VMC, HMC和VTL集于一身
- 超精加工专用机
- 抛光专用机
- 制作SPM
- 金属切削SPM
- 原址专业化
- 数控机床
- 附件
- Services
翻译成 :-
编辑翻译